Water Treatment

Linha D’Água cooperates in the development of projects from the conception phase to the installation, operation and maintenance of the systems.

The partnerships established with other companies and the privileged relationship with some of the major producers worldwide of water treatment equipment’s, allied with a deep knowledge of the technologies envolved, applicability, advantages, disadvantages and limitations allows us to be, in the current days, more than just a mere equipment supplier, but a solutions provider to all stages of the water treatment process.

The optimization of processes, energetic efficiency and control of expenses of operation and maintenance are solutions and studies that Linha D’Água develops, always based on the detailed knowledge of the working principles of the equipements and processes employed in the treatment.

 

Available solutions for “Clean waters”:

  • Studies and projects of water treatment stations and irrigation systems for industrial and domestic applications, including the respective supply, installation and commissioning.
  • Development of specific projects for stages of treatment in water treatment stations
  • Projecting, dimensioning and installation of equipment’s:
    • Filtration and micro-filtration
    • UV disinfection
    • Destruction of micropollutants threw UV + H2O2
    • Instrumentation, automation and supervision (SACADA) of the entire process
  • Optimization of electrical consumption

Available solutions for “waste waters”:

  • Studies and projects of waste water treatments stations and irrigations systems for industrial and domestic applications, including the respective supply, installation and commissioning.
  • Development of specific projects for stages of treatment in water treatment stations
  • Projecting, dimensioning and installation of equipment’s:
    • Pre-treatment
    • Primary treatment
    • Secondary treatment
    • Advanced/tertiary treatment
    • Microfiltration
    • UV disinfection
    • Instrumentation, automation and supervision of the entire process
    • Aeration integrated systems
    • Instrumentation and SCADA
  • Optimization of electrical consumption
  • Aeration system implementation without any investment from the managing entity of the infrastructure. The cost is fully covered by the reduction in the electrical consumption, leading to an immediate reduction of costs for the managing entity itself.